AT_culinarybuildingAtterbury Job Corps Center Construction students have been cooking up a new look for the Culinary Building.

Cement students have resurfaced the entire kitchen floor, which included removing the old vinyl floor so they could polish the concrete slab beneath. Heavy Equipment Operator students are grading a nearby hill and flower bed so heavy rain won’t push water around the building’s walkways, where it collects.

This marks the second week the students have been at their tasks in hopes of making the Culinary Building look as good as the food students prepare inside it. Attaboy, Atterbury!